工程項目分布規(guī)范翻譯-中英對照
項目部各崗位人員Personnel in the positions of the project department 所有工作經(jīng)歷
(年限)All the working experience
(years) 類似工作經(jīng)歷
(年限)Similar working experience
(years) 完成或參加過類似規(guī)模的信號系統(tǒng)工程(個)The signal system projects with similar scope have been joined (number)
項目經(jīng)理(I級)Project manager (Grade I) 10年以上Over 10 years 5年以上Over 5 years 2個以上Over 2 projects
項目工程師
(中級職稱以上)Project engineer
(Above the medium-grade professional title) 5年以上Over 5 years 3年以上Over 3 years 1個以上Over 1 project
其它管理和技術人員Other management and technical personnel 3年以上Over 3 years 1年以上Over 1 year -
1.1 安裝計劃Installation plan
1. 在成立現(xiàn)場施工安裝項目部后的30天內,應根據(jù)本工程的實際情況編制一個詳細實用的施工組織設計及質量保證措施,并應與土建施工和其它設備安裝工作相協(xié)調。內容包括(但不限于):With 30 days after the site construction installation project department is established, the comprehensive and practical construction organization and quality assurance measure shall be compiled according the practical condition of this project, and it shall be coordinated with the civil engineering construction and other equipments installation. The content contains (but is not limited to):
1) 工程概況、主要指標。Project overview, principle indexes.
2) 工程項目分布圖表。Construction project distribution diagram.
3) 任務劃分、勞動組織、施工組織。Task divide, labor organization, construction organization.
4) 施工及安裝計劃。Construction and installation plan.
5) 施工及安裝項目管理人員名單、施工及安裝技術人員名單、履歷及資質證明。List of the construction and installation project management personnel, list of the construction and installation technical personnel, resume and qualification certification.
6) 各項專業(yè)配合、工序進度(如線路、供電、動照、通信、土建、通風空調、給排水及消防、軌道、綜合監(jiān)控、屏蔽門、防淹門等內容)。All the cooperation, process progress (like lines, power supply, lighting, communication, civil engineering, air-conditioning, water supply and drainage, fire protection, track, general monitoring, screen door, flood gate, etc.).
7) 施工方法、材料、設備供應進度以及測試計劃。Construction method, material, equipment supply progress and test plan.
8) 施工技術標準、技術措施、新工藝。Construction technical standard, technical measure, new process.
9) 保證施工質量、環(huán)境管理和生產(chǎn)安全的措施。Measures to guarantee the construction quality, environment management and production safety.
10) 保證工程材料質量的措施。Measures to guarantee the quality of the project material.
11) 工期保證措施。Measures to guarantee the project time limit.
12) 施工安全保證措施。Measures to guarantee the construction safety.
2. 應根據(jù)本基本技術要求的規(guī)定,在合同執(zhí)行的各個階段向招標人提交有關合同執(zhí)行的計劃和報告等,供審批。In accordance this basic technical requirements, the plans and reports of the contract implementation in all the stages of the contract implementation shall be submitted to Biddee for obtaining the approval.
3. 周/月進度報告Weekly / monthly progress report
負責每周/月提供周/月進度報告,周/月進度報告包括但不限于以下內容:Be responsible to prepare provide the weekly / monthly progress report in every week / month, weekly / monthly progress report contains but is not limited to the following items:
1) 上周/月進度情況(安裝、調試、人員等情況)The progress condition in the last week / month (installation, debugging, personnel, etc.)
2) 下周/月計劃工作(安裝、調試、人員、需招標人協(xié)調工作、申請支付計劃等情況)The work plan for the next week / month (installation, debugging, personnel, work need Biddee’s coordination, payment application plan, etc.)
1.2 監(jiān)理工程師Supervision engineer
1. 招標人將委托監(jiān)理工程師負責對本項目中的施工及安裝、系統(tǒng)調試等進行全過程監(jiān)理。投標人在合同執(zhí)行的整個階段配合監(jiān)理工程師的工作和接受監(jiān)理工程師的監(jiān)督。Biddee will commission the supervision engineer to supervise the whole processes of the construction and installation, system debugging in this project. During the whole process of the contract implementation, Bidder will cooperate with the supervision engineer to accept the supervision from the supervision engineer.
2. 監(jiān)理工程師對投標人選購的設備和材料的來源進行審核。Supervision engineer will check the source of the equipments and materials selected and purchased by Bidder.
3. 監(jiān)理工程師對投標人在信號系統(tǒng)設備安裝過程中所采用的工藝文件的完整性和有效性進行審查。Supervision engineer will check the integrality and validity of the process documents used by Bidder during the signal system equipment installation.
4. 監(jiān)理工程師對投標人的質量保證體系進行審查。Supervision engineer will check the Bidder’s quality insurance system.
5. 監(jiān)理工程師對投標人提出的階段生產(chǎn)進度計劃及實施措施進行審查。Supervision engineer will check the staged production progress plan and implementation measures proposed by Bidder.
6. 監(jiān)理工程師對生產(chǎn)進度計劃執(zhí)行情況進行跟蹤檢查,檢查和督促進度計劃的實施,核批投標人修正計劃。Supervision engineer will make the tracking inspection on the production progress plan implementation condition, supervise and urge the implementation of the progress plan, check and approve the Bidder’s modified plan.
7. 監(jiān)理工程師對投標人采購的重要原材料和關鍵外購件的質量進行檢查,對于不符合有關規(guī)定和標準的外購件,有權拒絕進入生產(chǎn)流程。Supervision engineer will check the quality of the important raw material and critical bought-in components purchased by Bidder. If the bought-in components do not comply with the relevant regulations and standards, the supervision engineer has the rights to refuse to use these bought-in components in the production process.
8. 監(jiān)理工程師對投標人的主要部件和關鍵工序進行監(jiān)督,嚴格控制質量。Supervision engineer will check the Bidder’s important parts and critical processes to strictly control the quality.
9. 監(jiān)理工程師參與驗收分包商提供的主要設備材料。Supervision engineer will join the acceptance of the important equipments and materials provided by the subcontractors.
10. 監(jiān)理工程師對本項目的施工和安裝進行全過程監(jiān)理,對投標人的施工計劃、施工組織、施工方案、施工工藝、安裝標準、工程圖紙、安裝圖紙等進行審查和確認,對施工中的隱蔽性工程進行現(xiàn)場確認和簽認。Supervision engineer will supervise the whole process of the construction and installation of this project, to make inspection and verification of Bidder’s construction plan, construction organization, construction plan, construction process, installation standard, engineering drawings, installation drawings, and to verify the hidden construction in the project on site and make the sign-off.
11. 監(jiān)理工程師將參加和協(xié)助信號系統(tǒng)的各項調試、系統(tǒng)調試、綜合聯(lián)調、驗收等工作,負責監(jiān)督投標人提供的設備性能是否達到技術規(guī)格書的技術要求。Supervision engineer will join and assist the debugging, system debugging, general combined test, verification and acceptance of the signal system. Supervision engineer will be responsible to supervise the performance of the equipments supplied by Bidder to see if the technical requirements of the technical specification are met.
12. 投標人必須向監(jiān)理工程師免費提交所有與項目有關的必需的數(shù)據(jù)及所有要求提供的資料。Bidder must submit all the project-related data and materials required to be provided to the supervision engineer in free.
13. 投標人及時遵從監(jiān)理工程師的指導。Bidder shall comply with the instruction of the supervision engineer.
14. 監(jiān)理工程師在工作中的簽字確認,并不能減少投標人對產(chǎn)品質量和工程質量的責任。The sign-off by the supervision engineer in the project shall not reduce Bidder’s responsibility of the product quality and construction quality.
15. 監(jiān)理工程師有權要求投標人立即撤換不能勝任本項目施工及安裝工作、玩忽職守、行為不端的人員。Supervision engineer has the rights to request Bidder to immediately replace the incapable, derelict and misbehaved personnel in the construction and installation of this project.
16. 監(jiān)理工程師有權對如下情況簽發(fā)停工指令:Supervision engineer has the rights to issue the stop work order in the following conditions:
施工及安裝人員未能按圖施工;The construction made by construction and installation personnel is not following the drawings;
施工及安裝人員的組成違反合同有關要求或不能勝任安裝工作,又不愿撤換;The composition of the construction and installation personnel is in violation with the contract-related requirements, or the personnel are incapable in the installation work, and the Bidder is not willing to make the necessary replacement;
施工工藝不合理或者必需機具不到位而開始施工;The construction process is not reasonable, or the construction is made without the necessary equipments being in place;
違反安全作業(yè)要求,野蠻施工;The safety working requirements are violated, barbarous construction;
其它有損質量及進度的行為發(fā)生Other activities that damage the quality and progress happen.
投標人應為去工程現(xiàn)場的監(jiān)理工程師等提供工程現(xiàn)場的方便條件如辦公場所、工地飲水、工作午餐、工地交通工具等。Bidder shall provide convenient accommodations in the construction site for supervision engineer, like office, potable water in the construction site, working lunch, transportation vehicle in the construction site, etc.